My brand new above ground basement!

The contractor told me that they'll be lowering the house onto the foundation wall a little after the Ocean City construction office approves the height on Friday. Then the mason will parge (coat) the foundation walls and pour the concrete floor, the plumber will reconnect the pipes, the electrician will do his connections. The last three things will be getting the new stairways attached, the outside shower up and putting the new driveway in. Oh, yes, I have to figure out how to get rid of that bright blue wall with the mirrors on the back of the house too.

Lookin' Good! Latest Update for the House Raising Project

Frank and I checked on the house on Sunday. We were amazed to see all the work that has been done during this cold weather. The cement block wall was about 4 feet high.

I got a call from Chuck Hennessy yesterday and he said that they hoped to complete the wall by tomorrow! He also told me that he hired the carpenter that will do whatever he has to do to get the house lowered onto the new wall.