Latest Pictures!
My brand new above ground basement!
The contractor told me that they'll be lowering the house onto the foundation wall a little after the Ocean City
construction office approves the height on Friday. Then the mason will parge (coat) the foundation walls and pour the concrete
floor, the plumber will reconnect the pipes, the electrician will do his connections. The last three things will be
getting the new stairways attached, the outside shower up and putting the new driveway in. Oh, yes, I have to
figure out how to get rid of that bright blue wall with the mirrors on the back of the house too.